专业字典>英语词典>easement翻译和用法

easement

英 [ˈiːzmənt]

美 [ˈiːzmənt]

n.  地役权(穿越或征用某人土地的权利); 安逸; 安乐

复数:easements 

经济

BNC.30145 / COCA.20140

牛津词典

    noun

    • 地役权(穿越或征用某人土地的权利)
      the right to cross or use sb's land for a particular purpose
      1. 安逸;安乐
        a state or feeling of peace or happiness

        英英释义

        noun

        • the act of reducing something unpleasant (as pain or annoyance)
          1. he asked the nurse for relief from the constant pain
          Synonym:easingalleviationrelief
        • (law) the privilege of using something that is not your own (as using another's land as a right of way to your own land)

          双语例句

          • Discussion and Legislative Proposal on Public Easement System in China
            对中国公共地役权制度的探讨和立法建议
          • Secondly, the author thought we should keep to the legislation principles in the legislation of easement system.
            其次论述了地役权制度的立法中应坚持的立法原则。
          • Mathematical analysis on the central line equation of easement curve in documents is processed.
            对文献中所建的缓和曲线中线方程进行了数学分析。
          • A right or entitlement which forms part of the ownership of a property and which passes to a new owner when title passes ( i.e.an easement or right of way over another property).
            构成物业部分所有权,随产权一同转移给新所有人的权力。
          • Aerodynamic roughness length is a important feature to easement soil resistance to wind erosion.
            耕作土壤表面空气动力学粗糙度是评价土壤可蚀性的重要指标。
          • Cue up a touch more quantitative easement, in the shape of that big bad bond buy.
            为再多一些定量宽松做好准备吧,其形式是大规模的不良债券购买。
          • This part of the relevant theories contributes to understand the easement detailedly.
            这部分内容有助于对地役权的相关理论进行详细的了解。
          • The third part: The influence of public ownership of land to easement.
            第三部分:我国土地公有制对地役权制度的影响。
          • Development of property acquisition and easement agreements will also be considered as part of the overall construction schedule.
            编制财产获取和地役权协议,视为整体施工进度表的一部分。
          • But the construction phase can only begin after route selection, easement negotiations, environmental permitting, and many other pre-construction actions have been accomplished.
            但是管道的建设期是在管道定线,土地使用权限和环境评估通过之后才能进行,并且大多数的管道施工的前期工作都已经完成了。